Complete Group is proud to announce that the first commercialized drill string of 4 ½” 400 DUO drill pipe and HWDP has successfully performed over 10,000 meters of drilling over 2 wells in Northern Alberta through summer & fall 2018, with more wells in the queue.

Feedback directly from the rig personnel has reinforced that the stabbing and spin-up performance of the 400 DUO is indistinguishable from other field-friendly connections, while also allowing drilling at torques over 30% higher than DS40; a combination enabled only by the DUO multi-taper design!

For a more in-depth discussion and details visit our case study on the development of the DUO connection.