DUO Inspection Results Summary – May, 2022

DUO Inspection Results Summary – May, 2022

430 DUO and 480 DUO results have been updated in the link below DUO Connection offers “Operation Forgiveness”, which minimizes rig non-production time and repair cost for operators DUO Inspection Results Summary DUO Brochure DUO...
DUO Inspection Results Summary – April, 2022

DUO Inspection Results Summary – April, 2022

DUO inspection results across all sizes in use continue to be positive. DUO Connection minimizes downtime and repair costs to the operators.  A summary can be found in the link below. DUO Inspection Results Summary DUO Brochure DUO...
450 DUO Drill Strings Shine in West Texas

450 DUO Drill Strings Shine in West Texas

The 450 DUO, designed as a high torque, field friendly 4-1/2” drill pipe connection, has been successfully deployed and inspected in the Permian Basin of West Texas, the world’s largest and most productive shale basin. The strings of Range 3 pipe were manufactured...