DUO® Success Story

DUO® Success Story

Since its release in 2018, the DUO® family of high torque connections had achieved successful exposure throughout North America. In the fall of 2021, a 5000 meter 4½” sour service drill string with 400DUO® connections was deployed with an operator in north east...
DUO Inspection Results Summary – May, 2022

DUO Inspection Results Summary – May, 2022

430 DUO and 480 DUO results have been updated in the link below DUO Connection offers “Operation Forgiveness”, which minimizes rig non-production time and repair cost for operators DUO Inspection Results Summary DUO Brochure DUO...