by Admin | Apr 22, 2022 | Drill Pipe, DUO
DUO inspection results across all sizes in use continue to be positive. DUO Connection minimizes downtime and repair costs to the operators. A summary can be found in the link below. DUO Inspection Results Summary DUO Brochure DUO...
by Admin | Feb 22, 2021 | Drill Pipe, DUO
Recently an inspection was performed on a string of custom built 4 3/4″ drill pipe with 480 DUO connections. The results of the inspection are highlighted in this revised summary report. The report has been updated to show how Complete Group’s expertise...
by Admin | Jul 30, 2020 | Drill Pipe, DUO
586 lengths of 4 1/2″ 16.6 lbs/ft S135 400 DUO range 2 drill pipe and 100 lengths of 4 1/2″ 400 DUO heavyweight were inspected with 12 ends (<1%) needing machine shop repairs. This remains consistent with past inspection results on all sizes of the DUO...